DMCI SHIFTS COAL-FIRED POWER PLANT FROM ABORLAN TO BATO-BATO, NARRA




Mga Kababayan sa Palawan:


The efforts to put up a coal-fired power plant in Palawan is now in Barangay Bato-Bato, Narra, Palawan. Latest information from reliable sources, although not official, confirm that around 80% of the residents of Bato-Bato have approved the coal-fired power plant project of DMCI. Therefore, the fight against coal shifts from Puerto Princesa City and Aborlan to Narra, which is under the mayorship of Hon. Lucena Demaala.

Mga Kababayan, kung naaprubahan na po ng mayorya ng mga residente ng Bato-Bato ang coal plant (maigsing tawag natin sa coal-fired power plant), nasa kamay na po ng Sangguniang Bayan ng Narra ang susunod na hakbang: ang pag-aapruba at pagpapasa ng isang resolusyon na nag-eendorso ng coal plant.

Atin po sanang talasan ang ating mga pakiramdam, paningin, at pandinig upang tayo ay makabalita kung kailan at makadalo sa sesyon ng konseho ng Bayan ng Narra na tatalakay sa coal plant. Maaari po tayong humiling ng isang mas malawak na public hearing tungkol sa coal plant upang magkaroon tayo ng pagkakataon na ipahayag ang ating pagtutol. Naisin po natin na makialam sa mga desisyon na may direktang epekto sa atin bilang mga Palaweno. Huwag po tayong manahimik lamang. Ipaalala po natin sa ating mga inihalal na mga lider ng Narra na sila ay ating mga boses sa Konseho at hindi sila dapat nagsasalita o nagdedesisyon para lamang sa kanilang pansariling kapakinabangan.

Ipaglaban po natin ang ating kalikasan! Huwag maging sunud-sunuran sa kagustuhan ng iilang mga gahaman! Sumama po tayo sa mga gaganaping pagkilos!

KAHIT SAAN NYO DALHIN YAN, NO TO COAL PA RIN KAMI SA PALAWAN!!!




Generation Cost of Coal Fuel Combo: Coal Is Most Expensive!

How does coal compare with other power supply options? 


Coal mixed with other fuels is the MOST EXPENSIVE in terms of generation cost, yet, it is the preferred power source by the Palawan Provincial Government. 


If not coal, what then? Go for renewable energy.

Renewable Energy Projects in Palawan


Secretary Petilla has identified renewable energy projects in Palawan. Note that there are five potential hydro power plants in San Vicente but there are no takers yet (yellow in the picture below). 

Aborlan is not named in the map despite the potential hydro power source in Talakaigan.





Recommendations of DOE Secretary


Here are the recommendations of Sec. Petilla regarding renewable energy in Palawan. 




In the recent energy summit in Palawan, one of the measures adopted to resolve the power problems in the province is the "adoption of the Palawan Power Situationer and Outlook that was presented by Department of Energy Sec. Carlos Jericho Petilla." 

Any action to push the coal-fired power plant in Palawan is not consistent with the findings, conclusions, and recommendations made by DOE Secretary Petilla.

Every Palaweno should realize that there are better and cheaper options other than coal. Let us not be fooled into thinking that coal is the only option! 




Source of images: Petilla, J.C. 2014. Palawan Power Situationer & Outlook. Paper presented during the Palawan Energy Summit, 24 January 2014, Puerto Princesa City.


Causes of Brownouts in Palawan from October 2013-January 2014

Are the brownouts in Palawan caused by lack of power supply? 

The Palawan Electric Cooperative (PALECO) informs its members of power maintenance schedules through its Facebook page. A quick survey of its posts revealed that the causes of 34 instances of brownouts in a 4-month period from October 2013 to January 2014 are related to poles (replacement, addition), generators (tripped, emergency shutdown, replacement), line (line fault, line conversion, clearing, resagging), and line to ground fault due to gecko that short circuited and caused a total blackout in the entire Palawan grid. 

In the graph and table below are the dates and the corresponding causes of brownouts (copied verbatim from the Facebook page of PALECO). In my limited understanding of generators and electricity, I cannot see a cause that indicates  a lack of power supply. 

In short, the brownouts are not due to lack of power but due to the poor state of the transmission and distribution lines. So do not be lead into thinking that we are desperately in need of additional power through a coal-fired power plant. The coal-fired power plant will not solve the brownouts.  
   
Click on the graph for bigger view



DATE
CAUSES OF POWER INTERRUPTION
1
Enero 29, 2014 (MIYERKULES)

Pagdaragdag ng poste malapit sa St. Mary’s Subd., pagdugtong ng linya ng mga sitio sa ilalim ng Sitio Electrification Program (SEP) at pagpapalit ng cross-arm sa harap ng 168 mall.
2
January 24, 2014 
PPGI Unit #3 tripped, engine fault indication due to lube oil low pressure.
3
January 16, 2014 (Thursday)
Replacement of poles at Pangobilian and Lada; And Installation of transformers at DENR and Multipurpose Cooperative
4
January 10, 2014
Unit No. 1 and 3 of Delta P Tripped.
5
January 8, 2014 (Wednesday)
Replacement of Rotten Pole (C8 construction assembly)
6
January 5, 2014
Emergency Shutdown of Unit #4 of Delta P
7
December 20, 2013
Delta P unit #1 indication – overspeed.
8
December 19, 2013
Damaged Transformer Pole near NIA Office
9
December 19, 2013 (Thursday)
Installation of additional pole for NOVO tapping pole.
10
December 17, 2013 (Tuesday)
Replacement of rotten poles at Iwahig National Highway, ahead of Bucana Housing (pole nos. PP0168, PP0169 and PP0621) and realignment of pole (pole no. PP0616).
11
December 16, 2013
Line fault - damaged pole and insulator. Power will be restored immediately after the completion of line rehabilitation and construction of pole.
12
December 16, 2013
Line fault
13
December 13, 2013
Line Fault at National Power Corporation Tie Line (busted suspension insulators found near Irawan Substation)
14
 December 6, 2013
Unit # 2 of Delta P Tripped – Indication was over speed.
15
December 4, 2013 (Wednesday)
Replacement of pole at Iwahig Highway.
16
December 3, 2013 (Tuesday)
Replacement of pole at Barangay Concepcion National Highway.
17
November 30, 2013
All recloser with Auto Load Dropping (ALD) tripped. This was caused by tripping of units of PPGI and DMCI. Disturbance initiated from over loading of Unit #1 and Unit # 2 and breaker failure of Unit # 3 of PPGI. DMCI over frequency tripping was cause by a big loss of demand affected by ALD.
18
November 28, 2013 (Thursday)
Replacement of rotten poles at Binduyan at National Highway
19
November 27, 2013 (Wednesday)
Continuation of Single Phase to Three Phase Line Conversion along Abad Santos Street.
20
November 19, 2013, at 6:07 pm Total Blackout at the entire Palawan Grid (Puerto Princesa City and Southern Municipalities)
Line to ground fault due to a gecko short circuited at Irawan 40 MVA National Power Corporation Substation power transformer bushing.
21
November 19, 2013
NAPOCOR Total Plant Shutdown
Replacement of 600 kW generating set by a 1,000 kW generating set (rental unit.)
22
November 18, 2013
Temporary Line Fault
23
November 18, 2013
emergency stop of operation on Palawan Power Generations, Inc.'s Unit #1 due to fuel leak that resulted to ignite fire.
24
November 14, 2013 
Delta P Unit No. 3 tripped, oil mist detected. 
25
November 14, 2013 (Thursday)
Emergency line clearing
26
November 13, 2013 (Wednesday)
Single to three Phase Line Conversion along Abad Santos St.
27
November 06, 2013 (Wednesday)
For replacement of rotten poles along Abad Santos St.
28
October 26, 2013 (Saturday)
 For replacement of rotten pole and conversion of A1 to A14 pole construction assembly at Abad Santos Extn. near Alvin Lao Warehouse.
29
October 26, 2013 (Saturday)
Assist clearing of Acacia tree near Old Garcellano Bldg, Pardeco Bancao-Bancao.
30
October 25, 2013 (Friday)
Resagging of Primary Line
31
October 25, 2013 (Friday)
Replacement of rotten poles
32
October 02, 2013 (Wednesday)
Replacement of rotten poles (PP2864, PP2849, PP2846)
33
October 01, 2013 (Tuessday)
Replacement of rotten pole (PP4845) near Yayen's compound, installation of additional pole in front of Smart Tower at Abad Santos Extn. and conversion of primary poles from A1 to A14 construction near Drugman Warehouse, Abad Santos Extn.
34
October 01, 2013 (Tuesday)
Replacement of rotten pole at PAGASA Compound (PP4411 and PP4412)

Revoked and Restrained

December 6, 2013 marked two victories for Palawenos who are fighting against the coal-fired power plant project of DMCI.

First, the newly installed Barangay Council of San Juan, Aborlan passed a resolution that revoked their predecessors' endorsement of the coal plant. How this development will be received by the proponents and by the Governor of Palawan, a staunch supporter of DMCI, remains to be seen.

Second, the homegrown advocates of No To Coal who organized and called themselves SAFE (Save Aborlan From Evils) went to court for a temporary restraining order. A few hours after the announcement of the resolution's revocation, the Regional Trial Court of Palawan under Judge Joselyn Dilig issued a 72-hour Temporary Environmental Protection Order or TEPO. It prohibits the Palawan Council of Sustainable Development from issuing a SEP clearance to DMCI until the court clarifies the issue.




These twin victories were capped by the visit of Lolita Carbon, the voice behind the famous 70's band, Asin. Lolita Carbon held a free concert where she gamely sang with Palaweno talents. She vowed to come back to support the No To Coal initiative via a concert cum rally.

We are hopeful that the odds will be on the No To Coal side in the coming days and weeks. Little victories such as these serve as inspiration among the defenders of Palawan against environmental destruction.

PALECO IS THE CULPRIT BEHIND THIS COAL CONTROVERSY

Below is an article written by Mr. Joey Mirasol and posted originally at Bantay PALECO. It serves  as an exposition on the current power situation in Palawan. 



Due to much hecticity, have not posted much lately. But it’s nice to note that the No To Coal group has added Paleco to their gunsight, Paleco being the culprit behind the controversial coal plant that has divided our citizenry and raised doubts about the quality of our new provincial leaders.

The truth is now clear. The coal plant will not solve our electric power crisis. No additional power will be added to the existing 55MW of dependable generating capacity. DMCI has fulfilled their supply contract of 25MW using their diesel gensets, and the coal plant will only serve to increase DMCI’s profitability by allowing them to retire their less pollutive diesel gensets and shift to highly pollutive but less expensive coal. Need we help raise David Consunji’s ranking above being the #5 richest man in the Philippines?

Our power crisis is not caused by a lack of supply but by poor transmission and distribution facilities, problems not caused by the power producers but by Napocor and Paleco. The main order of business is to improve our transmission and distribution facilities, not to protect the power generators. Wasn’t it stupid on the part of Paleco to bid out power requirements way in excess of what we need? Our peak load as at October 2013 was 27MW, and even assuming a high demand in December of up to 30MW, we have an unused excess generating capacity of 25MW. Did Paleco ensure DMCI’s bid by requiring 25MW, when we could have done with 15MW through 2016? In doing so, Paleco disqualified renewable energy providers, who could only offer no more than 16MW within the 2 year time-frame given in the bid guidelines prepared by the consultant who is rumored to be allied with DMCI. Clear and simple bid rigging, don’t you think?

Our provincial leadership is obviously misinformed. Their desire to assure supply when needed may have led them to endorse the coal plant. But Paleco’s forecast demand will not consume the excess supply till beyond 2016. Paleco reports that as at September 2013, the status of electrification is 89% of 288 barangays province-wide. If by some miracle all were to be electrified today, we would need only an additional 3MW to supply the total requirements. But of course not all of the 31 barangays awaiting energization can be supplied without first running transmission and distribution lines, which should have been Paleco’s priority. PNoy’s ongoing sitio electrification program will also help increase the number of barangays electrified with off-grid systems for those that are in the islands or are very remote.

Our leaders are also under the impression that there are no serious renewable energy investors available, thus they may as well approve coal. Wrong again, because there is a serious hydro power provider that has been ignored by Paleco and a biomass power proponent (although this would again involve pollution because of wood-burning) waiting for a power supply agreement from Paleco. Due to the excess capacity, Paleco is not inclined to consider any other power supply provider, whether this be fossil fuel or renewable sources. Did Paleco create a coal monster that they are stuck with?

The solution to our power crisis is to improve the management of Paleco. We have a board made up of 3 overstaying directors, 1 past the qualified age, 2 who are mortal enemies, and the rest bystanders. Add to that an unqualified general manager, and you have a totally inept, self-serving and morally bankrupt management. Let us not forget that Paleco is our cooperative, it belongs to us members, and only we can do what is necessary to effect the much needed changes that will ensure a service-oriented, transparent, accountable and effective electric cooperative.

I have been waging a quixotic war against the GM and the board since September, to no avail. I have gone to the extent of filing a verified complaint with the NEA against the appointment of GM Sarra, who thick-facedly clings to her illegally-appointed position. I now need the help of the members to effect what needs to be done, which is to declare the positions of the entire board and general manager vacant.

Let us sign the No To Coal group’s petition to hold a general assembly, during which we should file a resolution to declare said positions vacant, and elect an interim board to serve for one year with the task of amending the cooperative’s by-laws and improving the service of Paleco, conditioned with the proviso that those elected to the interim board can no longer run as directors or apply for management positions in Paleco.

Are you all willing to do this for the good of our cooperative?